Files available for download from this website are in PDF format. Adobe Reader will be required to view these files. Get FREE Adobe Reader here
Please note that some of these files are very large and may take some time to download. Monitoring locations are shown in the Austar Environmental Monitoring Network plan.
Noise Monitoring
Quarter 4 2010
Quarter 3 2010
Quarter 2 2010
Quarter 1 2010
Quarter 4 2009
Quarter 3 2009
Quarter 2 2009
Quarter 1 2009
Quarter 4 2008
Quarter 3 2008
Quarter 2 2008
Quarter 1 2008
Quarter 4 2007
Quarter 3 2007
Quarter 2 2007
Quarter 1 2007
Dust Deposition Gauges
Dust Deposition Results to October 2011
Dust Deposition Results 2010
Dust Deposition Results 2009
Dust Deposition Results 2008
High Volume Air Samplers
HVAS Results to October 2011
HVAS Results 2010
HVAS Results 2009
HVAS Results 2008
Surface Water
pH Results to October 2011
Electircal Conductivity Results to October 2011
pH Results 2010
Electrical Conductivity Results 2010
pH Results 2009
Electrical Conductivity Results 2009
pH Results 2008
Electrical Conductivity Results 2008
Subsidence
Stage 2 - Longwall A4 - End of Panel Report
Stage 2 - Longwall A3 - End of Panel Report
Vibration
Stage 2 Vibration Results to Sep 2011
Ecology - Stage 2
Stage 2 Ecology - 2010
Stage 2 Ecology - 2009
Stage 2 Ecology - Baseline